Kembali ke katalog
Fully automated tissue processor, TSP-3E — Histologi & Patologi

Foto produk resmi · 1 tampilan

General Lab

Fully automated tissue processor, TSP-3E

Fully Automated Tissue Processor TSP-3E memiliki 14 cup dengan kapasitas 2000 ml/cup, 2 set mekanisme operasi, kapasitas basket 2 basket @130 pcs/basket, frekuensi agitasi 0-6 kali/menit (dapat diatur), dan rentang suhu RT-80°C ±1°C.

Yang akan anda dapatkan jika membeli Fully automated tissue processor, TSP-3E dari kami

  • Garansi Resmi Prinsipal

    Unit didistribusikan resmi dengan garansi prinsipal sesuai ketentuan pabrikan.

  • Instalasi & Training

    Teknisi kami membantu instalasi dan pelatihan penggunaan alat di lokasi Anda.

  • Dukungan Teknis & Sparepart

    Layanan purna jual, konsultasi teknis, dan ketersediaan suku cadang.

  • Opsi Kalibrasi

    Tersedia layanan kalibrasi tertelusur untuk menjaga akurasi instrumen.

Technical Specifications

Number of Cups14(10 for reagents, and the cups at the 11th, 12th, 13th, and 14thstations are used for paraffin melting) Two baskets;
Capacity of Each Cup2000ml
Dehydration basket capacity162*62*129 (mm) (125 dehydration cassettes/each)
Single tank processing timeAny length between 0 and 99 hours 59 minutes for the 1st and 2nd cup Any length between 0 and 23 hours 59 minutes for the 3nd to 14th cup
Wax tank temperature control rangeRT – 80℃;
Temperature Control Precision±1℃;
Programmable settingsMechanism A: 20 sets. Mechanism B: 20 sets
Drainage timeAdjustable from 10~60 seconds,increment of 10 seconds.shake/drip above cup
Frequency of Agitation0 – 6 times/min adjustable;
Tissue protection tankMechanism A: 7th tank. Mechanism B: 5th tank
Dehydration BasketDivided into three layers to ease the categorization of tissue.
Working VoltageAC 220V±10% 50Hz (standard model); AC110V±10% 60Hz
Power550W
Dimensions1370×440×525 mm (W×D×H)
Weight102kg
Package Dimension (W*D*H) (mm)1520*610*770
G.W.(kg)155Kg

Butuh penawaran resmi untuk produk ini?

Tim sales kami akan mengirimkan quotation lengkap (harga, lead time, biaya instalasi) dalam 1×24 jam kerja.